DRAFT — under teacher review.

Excalidraw Diagram Starters — C02

The Hamilton and Alexandra College · Year 12 · 2026

Drawing from scratch each session costs 10–15 minutes of setup time and often produces inconsistent notation across the three diagrams. These Excalidraw starters give you pre-framed skeletons — correct shapes, correct labels — so you can focus on the content, not the canvas.

Tip

Start in Excalidraw, then practise hand-drawing from your finished version. The Excalidraw skeleton is the plan; your hand-drawn version under timed conditions is the performance.


Watch first (≈3 min)

Lvl 99 TechSkillz — beginner Excalidraw tour. Watch for: navigation and shape drawing (0:23), styling (0:38), and library/sharing basics. You only need the first 90 seconds for C02 — the rest is optional polish.


Why consistent notation matters

All three C02 diagrams use the same cast of external entities. If the entity is named "Student" on your context diagram, it must be named "Student" (not "User" or "Person") on your DFD. Starting from a shared canvas makes this consistency automatic.


Getting started in Excalidraw

Excalidraw is available free at excalidraw.com. No account required. Your teacher may share a .excalidraw file directly — open it with File → Open.


Skeleton: Context Diagram

The context diagram has exactly one system circle. Everything else is an external entity (rectangle) or a data flow (labelled arrow).

flowchart LR
    A[Entity A]
    B[Entity B]
    C[Entity C]
    S(("Your System<br/>Name"))

    A -->|labelled flow| S
    S -->|labelled flow| B
    C -->|labelled flow| S
    S -->|labelled flow| C

Shape key

Shape What it represents
Rectangle External entity (a person, organisation, or external system)
Circle / oval The entire system — one only
Labelled arrow Data flow — must carry a specific name (not "data" or "info")

Skeleton: Level-1 Data Flow Diagram

The Level-1 DFD decomposes the single system circle into 3–6 numbered processes. Use the same external entities as your context diagram.

flowchart LR
    A[Entity A]
    B[Entity B]
    P1((1. Process<br/>Name))
    P2((2. Process<br/>Name))
    P3((3. Process<br/>Name))
    DS[("Data Store")]

    A -->|input| P1
    P1 -->|store| DS
    DS -->|retrieve| P2
    P2 -->|output| B
    P2 --> P3
    P3 -->|update| DS

Shape key

Shape What it represents
Rectangle External entity — same names as context diagram
Circle / oval A numbered process (verb–noun phrase, e.g. "1. Verify Login")
Cylinder / double-rectangle Data store (named collection of stored data)
Labelled arrow Data flow

Skeleton: Use Case Diagram

The use case diagram shows who can do what with your system. Actors (stick figures) sit outside the system boundary; use cases (ovals) sit inside.

flowchart LR
    A1(["👤 Actor A"])
    A2(["👤 Actor B"])

    subgraph SB["The System"]
        UC1((Use Case 1))
        UC2((Use Case 2))
        UC3((Use Case 3))
        UC4((Use Case 4))
    end

    A1 --- UC1
    A1 --- UC3
    A2 --- UC2
    UC1 -.->|«include»| UC2
    UC4 -.->|«extend»| UC3

Shape key

Shape What it represents
Stick figure (outside box) Actor (a person or external system that uses the system)
Oval (inside box) Use case (a function the system performs)
Rectangle System boundary
Solid line Association (actor participates in use case)
Dashed arrow «include» Use case A always triggers use case B
Dashed arrow «extend» Use case B sometimes triggers optional use case C

Practice check — before the hand-drawn validation


See also


← Back to VCE Software Development Hub